EXPERIENCES LIST

No.YearClientOwnerDescriptionWork CategoryLocation
1Jan - Feb 2020PT Vopak Terminal MerakPT Vopak Terminal MerakWall Partition (GRC Partisi & Pintu Utama Office)Civil, Building WorkMerak
2January - 2020PT Vopak Terminal MerakPT Vopak Terminal MerakWaste Domestic ContainerCivil WorkMerak
3Jun 2020 - NowPT Vopak Terminal MerakPT Vopak Terminal MerakHazard Chemical SignboardCivil WorkMerak
4Jun 2020 - NowPT Vopak Terminal MerakPT Vopak Terminal MerakRak Sample BottleCivil, Building WorkMerak
5in progressPT Asahimas ChemicalPT Asahimas ChemicalElectrical & Instrumentation construction for daily maintenanceElectrical/InstrumentCilegon
6Nov - Dec 2019PT BP Petrochemical IndonesiaPT BP Petrochemical IndonesiaWater Canteen PurifierCivil, Building Work + E/ICilegon
7Oct ~ Nov 2019PT BP Petrochemical IndonesiaPT BP Petrochemical IndonesiaElectrical & Instrumentation construction for daily maintenanceElectrical/InstrumentCilegon
8Sep-19PT Fuji Furukawa EngineeringPT LatinusaInstall Trafo 2500kVa 2 unit & replacement Rect during shutdownElectricalCilegon
9Sept ~ Nov 2019PT Asahimas ChemicalPT Asahimas ChemicalElectrical construction for New Common Facility Building ( CA, PVC & VCM plant)ElectricalCilegon
10August ~ Sept 2019PT Asahimas ChemicalPT Asahimas ChemicalElectrical construction & service during shutdown phase period ElectricalCilegon
11May - July 2019PT Chandra Asri PetrochemicalPT Chandra Asri PetrochemicalProvide Concrete Pond for Cleaning HE at Utility AreaCivil WorkAnyer
12April - Sept 2019PT Asahimas ChemicalPT Asahimas ChemicalRelocation of 22 kV cable for Rectifier CA-1 @ R/S-01 & TR-01-01 @ S/S-01ElectricalCilegon
13April - Sept 2019PT Asahimas ChemicalPT Asahimas ChemicalConstruction cable rack from R/S-1 to W/H-2 projectCivil & StructureCilegon
14Dec 2018 ~ Jul 2019PT Matra Upaya TangguhPT Chandra AsriH2 Transfer Line FacilityElectrical/InstrumentCilegon
15Feb ~ Sept 2019PT Asahimas ChemicalPT Asahimas ChemicalElectrical Construction for Ethylene ProjectElectricalCilegon
16Dec 2018PT Asahimas ChemicalPT Asahimas ChemicalElectrical work for common facilities @Power PlantElectricalCilegon
17Oct 2018Formosa Heavy IndustriesPT Asahimas ChemicalManpower supply for supporting Coal Handling Work @ Power Plant ElectricalCilegon
18Dec 2018PT. Petrokimia Butadiene IndonesiaPT. Inti Karya Persada TehnikFireproofing work for Butadiene PlantCivil, Building WorkCilegon
19Sep ~ Oct 2018PT Sulfindo Adi UsahaPT Sulfindo Adi UsahaShutdown work for calibration instrumentation CA plant & EDC/VCMInstrumentationCilegon
20Sep 2018 ~ Jan 2019PT Asahimas ChemicalPT Asahimas ChemicalVCM-3 WWT Electrical Project ElectricalCilegon
2123 Agt ~ 15 Dec 18PT Asahimas ChemicalPT Asahimas ChemicalVCM-2 WWT Electrical Project ElectricalCilegon
22July 2018 ~ Aug 2019PT. Chandra AsriPt. Chandra AsriRe-Route C2 Pipeline ProjectCivil, PipingCilegon
23Apr 17 - March 18PT. Petrokimia Butadiene IndonesiaPT. Inti Karya Persada TehnikButadiene Plan Expansion ProjectCivil, Building WorkCilegon
24Jan~Dec 17PT Mitsubishi Chemical IndonesiaPT Mitsubishi Chemical IndonesiaDaily Construction ProjectElectricalCilegon
25Jan~Dec 17PT Asahimas ChemicalPT Asahimas ChemicalDaily Construction ProjectElectricalCilegon
26Jan~Dec 17PT BP Petrochemical IndonesiaPT BP Petrochemical IndonesiaDaily Construction ProjectElectricalCilegon
27Jan~Dec 16PT BP Petrochemical IndonesiaPT BP Petrochemical IndonesiaDaily Construction ProjectElectricalCilegon
28Sep ~ Dec 2017Fuji Furukawa Engineering & ConstrPT Krakatau Osaka SteelElectrical work for construction PT KOSElectricalCilegon
29Nov 16 - Aug 17PT. JGC IndonesiaPT. PertaminaBandara International Jawa Barat Kertajati ProjectCivil, Stucture, PipingJawa Barat
30Nov 15 - June 16Pt. Toyo - IKPT CoorporationPt. Chandra AsriCAPECCx ProjectCivil, Stucture, PipingCilegon
31May 14 - June 16Pt. Toyo - IKPT CoorporationPt. Chandra AsriCAPECCx ProjectCivil, Stucture, PipingCilegon
32Jun 14 - March 15Pt. Asahimas ChemicalPt. Asahimas ChemicalPipe Rack Raw Water Treatment Phase 6Civil, Stucture, PipingCilegon
33Dec 13 - Mar 14PT Bluescope Steel IndonesiaPT Bluescope Steel IndonesiaSupply & install interconnection panel gensetElectricalCilegon
34Dec 13 - Mar 14PT Vopak Terminal MerakPT Vopak Terminal MerakUpgrade MCC-1, 2 for accommodate increase of power demandElectricalCilegon
35Dec 13 - Jan 14PT Air Liquide IndonesiaPT Air Liquide IndonesiaCivil work for Genset house and foundation KK3 projectCivilCilegon
36Nov - Dec 13PT Asahimas ChemicalPT Asahimas ChemicalStreet lighting replacement & power cable around sea shoreElectricalCilegon
37Nov - Dec 13PT Air Liquide IndonesiaPT Air Liquide IndonesiaSupply Trafo 630 KVA, 11/20 KV-400VElectricalCilegon
38Nov - Dec 13PT Mitsubishi Chemical IndonesiaPT Mitsubishi Chemical IndonesiaElectrical & instrumentation work during ASDM E/ICilegon
39Oct - Dec 13BAM DecorientBAM DecorientFormwork panels HS mould (1&2) (DP 20%)Structure Cilegon
40Oct - Dec 13PT Air Liquide IndonesiaPT Air Liquide IndonesiaCivil work for upgrade H2 facilitiesCivilCilegon
41Aug - Nov 13PT Amoco Mitsui PTA IndonesiaPT Amoco Mitsui PTA IndonesiaSupply & install SS304 tray & explosion proof CCTV cameraElectricalCilegon
42Sep 13PT Shinko Plantech IndonesiaPT Asahimas ChemicalTake out & re-install instrument ASC ASDM PVC UTL plantInstrumentationCilegon
43Aug - Sep 13PT Cabot IndonesiaPT Cabot IndonesiaPipe rack modificationStructure Cilegon
44Apr - Oct 13PT Sulfindo Adi UsahaPT Sulfindo Adi UsahaE/I work for CA plant Debottlenecking projectE/ICilegon
45Jun - Aug 13PT Air Liquide IndonesiaPT Air Liquide IndonesiaFoundation for autotrafo & temporary fence for H2 plantCivilCilegon
46Apr - Jun 13PT Mitsubishi Chemical IndonesiaPT Mitsubishi Chemical IndonesiaConst. work for WWB valve & WWT inlet stabilization projectE/ICilegon
21Jan - Mar 13PT Cabot IndonesiaPT Cabot IndonesiaEI installation - ME Coal tar project ElectricalCilegon
22Jan - Mar 13PT Cabot IndonesiaPT Cabot IndonesiaSupply & install MCC panelElectricalCilegon
23Jan - Feb 13PT Mitsubishi Chemical IndonesiaPT Mitsubishi Chemical IndonesiaElectrical modification work for Demine-2 projectElectricalCilegon
24Jan - Feb 13PT Air Liquide IndonesiaPT Air Liquide IndonesiaElectrical installation for FFSG projectElectricalCibitung
25Jan - Feb 13Toyo Global KoreaPT Chandra AsriSupply bulk material for electrical workElectricalCilegon
26Jan - Feb 13BAM DecorientBAM DecorientFab. of gantry crane rail foundation plate Structure Cilegon
27Dec 12 - Apr 13PT Vopak Terminal MerakPT Vopak Terminal MerakImprovement lighting on all tank farm area I, II, III, IV ElectricalCilegon
28Nov - Dec 12PT Mitsubishi Chemical IndonesiaPT Mitsubishi Chemical IndonesiaConstruction work for annual SDM PSDM plantE/ICilegon
29Nov - Dec 12PT Sorini Towa Berlian CorporindoPT Sorini Towa Berlian CorporindoCalibration works for annual SDMInstrumentationPasuruan
30Oct - Nov 12Toyo Global KoreaPT Chandra AsriSupply bulk material for electrical workElectricalCilegon
31Oct 12BAM DecorientBAM DecorientManufacture bull rail & piling gateStructure Cilegon
32Jun - Oct 12PT Amoco Mitsui PTA IndonesiaPT Amoco Mitsui PTA IndonesiaCCTV camera improvementElectricalCilegon
33May12-Feb13PT Taiyo Sinar Raya TeknikPT Taiyo Sinar Raya TeknikExpansion project for Nippon Shokubai Indonesia E/I work for SAP plantE/ICilegon
34Aug12-Mar13Toyo Engineering CorporationPT Nippon Shokubai IndonesiaFabrication & Install Pipe Hydrant & install support S/S for equipments, cooling tower, SUS PITStructure Cilegon
35Jun-Oct 12PT Redeco Petrolin UtamaPT Redeco Petrolin UtamaModfikasi Pipa TP II & install guidance pole ATG, ATS for T-109PipingCilegon
36Sep-12PT Vopak Terminal MerakPT Vopak Terminal MerakReplacement pipe line dia 10", 8", 6" SS304 joint for fuel at Jetty areaPipingCilegon
37May-Sep 12PT Mitsubishi Chemical IndonesiaPT Mitsubishi Chemical IndonesiaDaily maintenance worksE/ICilegon
38May-Jun 12PT Vopak Terminal MerakPT Vopak Terminal MerakInstallation work for grounding hog & emergency systemElectricalCilegon
39Apr-12PT Vopak Terminal MerakPT Vopak Terminal MerakDesign work for grounding hog & emergency systemElectricalCilegon
40Mar-Apr 12PT Bluescope Steel IndonesiaPT Bluescope Steel IndonesiaElectrical maintenance workElectricalCilegon
41Mar-Sep 12PT Sulfindo Adi UsahaPT Sulfindo Adi UsahaE/I work for VCM Revamping & HCL stripper E/ICilegon
42Feb-Apr'12PT Air Liquide IndonesiaPT Air Liquide IndonesiaElectrical work for install tray, pulling cable for analyzer lineElectricalCilegon
43Feb-12PT Cabot IndonesiaPT Cabot IndonesiaCalibration & certification instrumentation toolsInstrumentationCilegon
44Feb-12PT Sulfindo Adi UsahaPT Sulfindo Adi UsahaDesign work for E/I VCM Revamping & HCL stripperE/ICilegon
45Aug-Oct 11PT Sulfindo Adi UsahaPT Sulfindo Adi UsahaElectrical work for Debottlenecking ProjectElectricalCilegon
46Jun-Sep 11PT Air Liquide IndonesiaPT Air Liquide IndonesiaElectrical work for 450T/D Liquifier ProjectElectricalCilegon
47Jan-Apr'11PT Air Liquide IndonesiaPT Air Liquide IndonesiaElectrical work for Sigma Plant Gunung Garuda PjElectricalCibitung
48Jan-Mar '11PT Cabot IndonesiaPT Cabot IndonesiaFoundation Work (Merak Plant)Civil & StructureCilegon
49Feb-Jul'11PT Cabot IndonesiaPT Cabot IndonesiaDelta V Migration ProjectE,I, Civil & StructureCilegon
50Nov'10-Jan'11PT Bluescope Steel IndonesiaPT Bluescope Steel IndonesiaElectrical Installation of Chemical & Paint Store & Production HouseElectricalCilegon
5110-FebPT Air Liquide IndonesiaPT Air Liquide IndonesiaSupply cable trayElectricalCilegon
52Feb-Apr'10PT Air Liquide IndonesiaPT Air Liquide IndonesiaNetwork of secondary site trafo 45MVAElectricalCilegon
53Feb-Apr'10PT Air Liquide IndonesiaPT Air Liquide IndonesiaE/I installation indoferro projectElectricalCilegon
54Jan-Okt'10PT Bluescope Steel IndonesiaPT Bluescope Steel IndonesiaElectrical work for Badak ProjetElectricalCilegon
55Jan-Apr'10Babcock & Wilcox IndonesiaPT Jawa Manis RafinasiBoiler integration & installation E/ICilegon
56Jan-Apr'10Babcock & Wilcox IndonesiaPT Jawa Manis RafinasiAdd'l material supply cable for boiler integration projectE/ICilegon
5710-FebPT Sulfindo Adi UsahaPT Sulfindo Adi UsahaInstallasi grounding electric untuk CHG project danElectricalCilegon
58Jul-05PT Bluescope Steel IndonesiaPT Bluescope Steel IndonesiaElectrical Installation of New Site OfficeElectricalCilegon
59Feb-10PT Air Liquide IndonesiaPT Air Liquide IndonesiaSupply cable trayElectricalCilegon
60Feb-10PT Air Liquide IndonesiaPT Air Liquide IndonesiaNetwork of secondary site trafo 45MVAElect./Instr.Cilegon
61Feb-10PT Air Liquide IndonesiaPT Air Liquide IndonesiaE/I installation indoferro projectElect./Instr.Cilegon
62Jan-10PT Bluescope Steel IndonesiaPT Bluescope Steel IndonesiaElectrical work for install lighting & MCL2 temp. powerElect./Instr.Cilegon
63Jan-10Babcock & Wilcox IndonesiaPT Jawa Manis RafinasiBoiler integration & installation ElectricalCilegon
64Jan-10Babcock & Wilcox IndonesiaPT Jawa Manis RafinasiAdd'l material supply cable for boiler integration project  
65Jan-10PT Sulfindo Adi UsahaPT Sulfindo Adi UsahaInstallasi grounding electric untuk CHG project dan HCL absorption projectInstrumentationCilegon
66Dec-09PT Takada-Cahaya Anugerah TamaPT Asahimas ChemicalE&I work at storage tank ST-2101 for ASCElect./Instr.Cilegon
67Sep-09PT Bluescope Steel IndonesiaPT Bluescope Steel IndonesiaInstall & supply power cable, telephone cable, IT pipesElectricalCilegon
68Aug-09PT Newmont Nusa TenggaraPT Newmont Nusa TenggaraSupply & fabricate Cleaner Circuit Upgrade (CCU)Structure Cilegon
69Aug-09PT Asahimas ChemicalPT Asahimas ChemicalRepair loading shelter NaCiO and l-NaOHCivilCilegon
70Aug-09PT Asahimas ChemicalPT Asahimas ChemicalModification at MCC room at coal boiler plantCivilCilegon
71Aug-09PT Amoco Mitsui PTA IndonesiaPT Amoco Mitsui PTA IndonesiaResealing bottom tanks (Asphalt)CivilCilegon
72Aug-09PT Asahimas ChemicalPT Asahimas ChemicalConstruction of pipe rack for ST-5902 Loading facilityCivilCilegon
73Jul-09PT Amoco Mitsui PTA IndonesiaPT Amoco Mitsui PTA IndonesiaI/E service job for OutageInstrumentationCilegon
74Jul-09PT Bluescope Steel IndonesiaPT Bluescope Steel IndonesiaInstall power cable for new security houseElectricalCilegon
75Jul-09PT Bluescope Steel IndonesiaPT Bluescope Steel IndonesiaSupply power cable and install cable trayElectricalCilegon
76Jun-09PT Bluescope Steel IndonesiaPT Bluescope Steel IndonesiaElectrical Deferment Work for Badak ProjectElectricalCilegon
77May-09PT Sulfindo Adi UsahaPT Sulfindo Adi UsahaCCTV service installation & 1st & C line street lightingInstrumentationCilegon
78May-09PT Amoco Mitsui PTA IndonesiaPT Amoco Mitsui PTA IndonesiaPekerjaan On Call Emergency Anti Surge Controller 15K-101 MBElectricalCilegon
79Apr-09PERTAMINA UP VIPERTAMINA UP VIMaintenance Electrical WorkElectricalIndramayu
80Apr-09PT Takada-Cahaya Anugrah JOPT Takada-Cahaya Anugrah JOEstablish laydown areaInstrumentationCilegon
81Mar-09PT Mitsubishi Film IndonesiaPT Mitsubishi Film IndonesiaRepair steel structure and platform at CA-1 plantElectricalCilegon
82Feb-09PT Sulfindo Adi UsahaPT Sulfindo Adi UsahaChange order perbaikan, kalibrasi/resetting control valve, InstrumentationCilegon
83Jan-09PT Bluescope Steel IndonesiaPT Bluescope Steel Indonesiaresertifikasi PSV dan perbaikan Field Instrument TA 2008CivilCilegon
84Dec-08PT Sorini Towa Berlian CorporindoPT Sorini Towa Berlian CorporindoLepas/Pasang, Recondition dan Leak Test Block Valve pada InstrumentationPasuruan
85Dec-08PT Asahimas ChemicalPT Asahimas Chemicalsaat TA tahun 2008Structure Cilegon
86Dec-08PERTAMINA UP VIPERTAMINA UP VIPemasangan Anti Surge Controller 15-K-101 di Kilang UP-VI BalonganInstrumentationIndramayu
87Sep-08PT Balfour Beatty Sakti IndonesiaPT Bluescope Steel IndonesiaE/I Turn Around Work 2008CivilCilegon
88Sep-08PT Asahimas ChemicalPT Asahimas ChemicalConstruction of stairway for VCM shift tank platformStructure Cilegon
89Agu-08PT Amoco Mitsui PTA IndonesiaPT Amoco Mitsui PTA IndonesiaConstruction of security post at coal boiler access gateStructure Cilegon
90Agu-08PT Amoco Mitsui PTA IndonesiaPT Amoco Mitsui PTA IndonesiaConstruction of Sankyu Cabin and sample preparationElectricalCilegon
91Jul-08PT Amoco Mitsui PTA IndonesiaPT Amoco Mitsui PTA Indonesiaroom at coal boiler projectElect./Instr.Cilegon
92Jun-08PT Asahimas ChemicalPT Asahimas ChemicalEmergency controller replacement PVC 1Structure Cilegon
93Jun-08PT Asahimas ChemicalPT Asahimas ChemicalRepair platform at RE-5201/SP-2301/TW-2401/VE-2217/CivilCilegon
94Mei-08PT Yokogawa IndonesiaPT Asahimas ChemicalModification of PVC Laboratory at technical building-1CivilCilegon
95Mei-08PT Asahimas ChemicalPT Asahimas ChemicalInstrumentation work for ASDM PVC & Utility plantStructure Cilegon
    Overhaul safety relief valve   
96Mei-08PT Asahimas ChemicalPT Asahimas ChemicalElectrical work for ASDM CivilCilegon
97Mei-08PT Takada-Cahaya Anugrah JOPT Asahimas ChemicalInstall telephone for contractor and remove temp. panel &InstrumentationCilegon
98Mei-08PT Mc Pet Film IndonesiaPT Mc Pet Film Indonesiaelectrical maintenance work & manpower serviceInstrumentationCilegon
99Apr-08PT MC Engineering IndonesiaPT Mc Pet Film IndonesiaJob package for preheater subcooling temp. monitoringElectricalCilegon
100Apr-08PT Bluescope Steel IndonesiaPT Bluescope Steel IndonesiaSupply thermocouple cable, 1P x 1.5 mmsqElectricalCilegon
    Supply cable, silicon/silicone, 2C x 4mmsq & 2C x 2.5 mmsq   
101Mar-08PT Amoco Mitsui PTA IndonesiaPT Amoco Mitsui PTA IndonesiaE/I annual shutdown maintenance + supply matl.Elect./Instr.Cilegon
102Mar-08PT MC Engineering IndonesiaPT Mc Pet Film IndonesiaSupply pipe craddle frame # part 7 (PO 142901)InstrumentationCilegon
103Mar-08PT MC Engineering IndonesiaPT Mc Pet Film Indonesia InstrumentationCilegon
104Mar-08PT Air Liquide IndonesiaPT Air Liquide Indonesia Elect./Instr.Cilegon
105Mar-08PT Newmont Nusa TenggaraPT Newmont Nusa TenggaraSupply pipe craddle frame # part 7 (PO 142901)MechanicalNusa Tenggara
106Mar-08PT Newmont Nusa TenggaraPT Newmont Nusa TenggaraSupply pipe craddle frame # part 5 (PO 142156)MechanicalNusa Tenggara
107Mar-08PT Newmont Nusa TenggaraPT Newmont Nusa TenggaraSupply pipe craddle frame # part 3 (PO 141508)MechanicalNusa Tenggara
108Mar-08PT Bluescope Steel IndonesiaPT Bluescope Steel IndonesiaSupply pipe craddle frame # part 2 (PO 140388)MechanicalNusa Tenggara
109Mar-08PT Newmont Nusa TenggaraPT Newmont Nusa TenggaraSupply pipe craddle frame # part 6 (PO 141426)MechanicalNusa Tenggara
110Feb-08PT Newmont Nusa TenggaraPT Newmont Nusa TenggaraSupply pipe craddle frame # part 4 (PO 140713)MechanicalNusa Tenggara
111Feb-08PT Newmont Nusa TenggaraPT Newmont Nusa TenggaraSupply pipe craddle frame # part 1 (PO 140712)MechanicalNusa Tenggara
112Feb-08PT Bluescope Steel IndonesiaPT Bluescope Steel Indonesiatransformer 1 MVAElectricalCilegon
    Installation underground cable DLI rest room, cable XLPE/  
113Feb-08PT Bluescope Steel IndonesiaPT Bluescope Steel IndonesiaPVC, SWA 3C x 4 mmsqElectricalCilegon
114Feb-08PT Mc Pet Film IndonesiaPT Mc Pet Film IndonesiaConstruction of transporter room at administration buildingElectricalCilegon
    ELCB installation, KIT MV cable termination & Hipot test  
115Feb-08PT Asahimas ChemicalPT Asahimas ChemicalPurifying oil transformer 1 MVACivilCilegon
    Replace starting air tubing (press. 30 kg/cm2)  
116Feb-08PT Bluescope Steel IndonesiaPT Bluescope Steel IndonesiaAdd. heat detector fire alarm systemElectricalCilegon
117Jan-08PT Bluescope Steel IndonesiaPT Bluescope Steel IndonesiaConstruction of pedestrian way at Admin. Bldg areaElectricalCilegon
118Jan-08PT Mitsubishi Chemical Indonesia PT Mitsubishi Chemical Indonesia M/P service for repulling cable and install DB panelInstrumentationCilegon
119Jan-08PT Nippon Shokubai IndonesiaPT Nippon Shokubai IndonesiaLIG flushing line to transfer line BHV 510AB & BD500ElectricalCilegon
120Des-07PT Asahimas ChemicalPT Asahimas ChemicalSupply pipe craddle frameCivilCilegon
121Des-07PT Bluescope Steel IndonesiaPT Bluescope Steel IndonesiaCalibration txmitter & recorderElectricalCilegon
122Des-07PT Amoco Mitsui PTA IndonesiaPT Amoco Mitsui PTA IndonesiaFabrication for preparation Natco prj.ElectricalCilegon
123Des-07PT Newmont Nusa TenggaraPT Newmont Nusa TenggaraPIPIE ROLLER 10"MechanicalNusa Tenggara
124Des-07PT SAS InternationalPT Medco E&P IndonesiaPulling & rearrangement cable VCM areaInstrumentationJambi
125Des-07PT Multifab - Hanazono JONatco / Tripatra Ujung PangkahO/H control valve/transmitter catalistInstrumentationCilegon
126Nov-07PT Mc Pet Film IndonesiaPT Mc Pet Film IndonesiaReplacement gas cromatograph analyzer jobElectricalCilegon
127Nov-07PT Sulfindo Adi UsahaPT Sulfindo Adi UsahaDEG "E" instrument work ElectricalCilegon
128Nov-07PT Mitsubishi Chemical Indonesia PT Mitsubishi Chemical Indonesia Fabrication for modec petrobras prj.InstrumentationCilegon
129Okt-07PT Yokogawa IndonesiaPT TitanFabrication for preparation GDU projectInstrumentationCilegon
130Okt-07PT Mitsubishi Chemical Indonesia PT Mitsubishi Chemical Indonesia Daily maintenance works : MPS technician, groundingInstrumentationCilegon
131Okt-07PT Multifab - Hanazono JONatco / Modec Petrobras pjsystem installation MechanicalCilegon
132Okt-07PT Multifab - Hanazono JO Supply panel for motor controlMechanicalCilegon
133Sep-07PT Bluescope Steel IndonesiaPT Bluescope Steel IndonesiaInstallation telephone & lightingElectricalCilegon
    Manpower supply for supervisor & technician  
134Sep-07PT Bluescope Steel IndonesiaPT Bluescope Steel IndonesiaSludge dryer modi. Work (instr. Work)ElectricalCilegon
135Agu-07PT Mitsubishi Chemical Indonesia PT Mitsubishi Chemical Indonesia Steam trace installation N830 and N831ElectricalCilegon
136Agu-07PT Mitsubishi Chemical Indonesia PT Mitsubishi Chemical Indonesia Overhaul Pressure Safety Valves PSDM-1 Pet FilmElectricalCilegon
137Agu-07PT Mitsubishi Chemical Indonesia PT Mitsubishi Chemical Indonesia Incinerator Project (Instr. Work ) Capacity upInstrumentationCilegon
138Agu-07PT MC Engineering IndonesiaPT Mitsubishi Chemical Indonesia Overhaul Pressure Safety Valves PSDM TPA-1InstrumentationCilegon
139Agu-07PT MC Engineering IndonesiaPT Mitsubishi Chemical Indonesia Overhaul Control Valve (special valves) PSDM TPA-1InstrumentationCilegon
140Agu-07PT Mitsubishi Chemical Indonesia PT Mitsubishi Chemical Indonesia E/I daily maintenance work (period month of August))InstrumentationCilegon
141Aug-07PT Mitsubishi Chemical Indonesia PT Mitsubishi Chemical Indonesia Instrument construction work for IncineratorInstrumentationCilegon
142Aug-07PT Mitsubishi Chemical Indonesia PT Mitsubishi Chemical Indonesia Annual SDM 2007 for Instr. Cal. Work (TG, TT, TE)InstrumentationCilegon
143Aug-07PT Mitsubishi Chemical Indonesia PT Mitsubishi Chemical Indonesia E/I work maintenance for Betara Complex DevelopmentElect./Instr.Cilegon
144Aug-07PT Mitsubishi Chemical Indonesia PT Mitsubishi Chemical Indonesia E/I work daily maintenance InstrumentationCilegon
145Jun-07PT Sulfindo Adi UsahaPT Sulfindo Adi UsahaPanel modification work & T/O cable tray FA machineInstrumentationBojonegara
146Jun-07Chiyoda Intl. - IKPT JOPetrochina Jabung Intl. Ltd.HVAC modification workElect./Instr.Jambi
147Jun-07PT Mitsubishi Chemical IndonesiaPT Mitsubishi Chemical IndonesiaE/I shutdown maintenanceElect./Instr.Cilegon
148Mei-07PT MC Engineering IndonesiaPT MFIExpansion security & admin buildingElectricalCilegon
149Mei-07PT Amoco Mitsui PTA IndonesiaPT Amoco Mitsui PTA IndonesiaSupply & install injection for pumpElectricalCilegon
150Apr-07PT Air Liquide IndonesiaPT Air Liquide IndonesiaModi. purchasing buildingElect./Instr.Cilegon
151Jun-06PT Amoco Mitsui PTA IndonesiaPT Amoco Mitsui PTA IndonesiaPulling cable & trafo shelterElectricalCilegon
152Jun-06PT Natco Temporary FacilitiesMechanicalCilegon
153May-06PT Nippon Shokubai IndonesiaPT Nippon Shokubai IndonesiaSteel Structure & Civil Work BuildingCivilAnyer
154Apr-06PT Kokusai Keiso IndonesiaPT Bluescoope Steel IndonesiaPulling Cable Admin BuildingElectricalCilegon
155Feb-06PT Bluescope Steel IndonesiaPT Bluescope Steel IndonesiaSteel Structure & Piping Water SteamMechanicalCilegon
156Dec-05PT Pupuk Kujang CikampekPT Pupuk Kujang CikampekWare HouseCivilCilegon
157Nov-05PT Newmont Nusa TenggaraPT Newmont Nusa TenggaraRoller Frame TailingMechanicalNTB
158Mar-05PT Amoco Mitsui PTA IndonesiaPT Amoco Mitsui PTA IndonesiaShutdownStructure Cilegon
159Feb-04PT. Nippon Shokubai IndonesiaPT. Nippon Shokubai IndonesiaFabrication Part Cutting DiesStructure Anyer
160Mar-03PT. Energizer IndonesiaPT. Energizer IndonesiaStructure & Painting PlatformMechanicalJakarta
161Sep-02PT. Energizer IndonesiaPT. Energizer IndonesiaFabrication Part Cutting DiesMechanicalJakarta
162Mar-02PT. Nippon Shokubai IndonesiaPT. Nippon Shokubai IndonesiaSteel Structure & FabricationStructure Anyer
163Feb-02PT. Energizer IndonesiaPT. Energizer IndonesiaSteel Structure, Piping & CivilMechanicalJakarta
164Agu-01PT. Sulfindo Adi UsahaPT. Sulfindo Adi UsahaCivil & PaintingStructure Cilegon
165Jul-01Unifeco-SPC JOPT. Riken Asahi Plastic IndonesiaSteel Structure & Civil WorkStructure Cikarang
166Jun-00PT. Nissoku Tripolyta AcrylindoPT. Nissoku Tripolyta AcrylindoSteel Structure & Civil WorkCivilAnyer